You get the incentive in a day. You keep it for the depreciation, plus five years.
How to prove, year after year, that the machine still meets the requirements: what the law asks of your data, how long it must be kept and how to organise it.
The expert report captures one day. Continuity is for the company to prove, with data.
- The 2026-2028 hyper-depreciation (L. 199/2025, art. 1, paras 427-436, and the MIMIT-MEF implementing decree of 7 May 2026) increases the cost of 4.0 assets by 180% up to €2.5m (100% from €2.5m to €10m, 50% from €10m to €20m). With ordinary depreciation the deduction reaches 280% of the cost, spread over the whole depreciation period.
- The technical requirements, especially interconnection, must be met at first use and maintained for the whole benefit period.
- The benefit has a long procedure: notices to the GSE on 20 January and 30 June every year, from booking until the benefit ends.
- Failure to keep the documentation is an express ground for forfeiture in the implementing decree.
- Each instalment can be checked until 31 December of the fifth year after the return in which it is deducted (art. 43, Presidential Decree 600/1973). For an asset interconnected in 2026 and depreciated over ten tax years, the last instalment goes in the 2036 return: the archive is needed until 31 December 2041.
- The same logic applies to the Transizione 4.0 and 5.0 credits still in use; for 5.0 you also need energy consumption data before and after the investment.
Without a history of machine data and an orderly file for each investment, years later you may be unable to prove a requirement you always met.
Why we write about it. Nexus works where incentives meet technology: machine interconnection, integration with ERP and MES, data collection and retention. It is the part the tax adviser and the expert assessor take for granted, and that the company must guarantee for years.
The picture: three regimes coexist in 2026
The new hyper-depreciation covers investments from January 2026; the 4.0 and 5.0 credits cover past investments, but their maintenance and retention obligations are still running. Pick an aspect to compare them.
2026-2028 hyper-depreciation
+180% up to €2.5m; +100% from €2.5m to €10m; +50% from €10m to €20m
Transizione 4.0 tax credit
Rates by bracket, varying by year
Transizione 5.0 tax credit
Rates by bracket and savings band
Territoriality. Assets must be used in production facilities in Italy. Where they are made no longer matters: the EU/EEA production requirement was removed by Decree-Law 38/2026 (art. 7), converted by Law 88/2026, for investments from 1 January 2026. A specific constraint remains for assets used to self-produce renewable energy.
Maintaining the requirements over time: the machines send the data, the archive keeps it.
The requirement best proven, almost only proven, with data.
A 4.0 machine is interconnected when it exchanges information two-way with production management systems or the supply network, using protocols based on public, recognised specifications (for example OPC-UA, MQTT, Modbus, Profinet, Ethernet/IP), and is uniquely identified on the network. Remote viewing of machine status alone is not enough.
Does your machine have the required characteristics?
Tick what the asset can do. For each characteristic you see the data to store to prove it over the years.
- Control by CNC or PLCData sheet, manual and CE declaration in the asset file, with the serial number
- Interconnection with factory systems, with remote loading of instructions or part programsNetwork diagram and IP address with dated changes; logs of commands sent and data received; register of part-program or recipe downloads, with version and user
- Automated integration with logistics, the supply network or other machinesStock movements, progress and consumption recorded automatically by the machine-to-ERP flow
- Simple, intuitive human-machine interfaceData sheet and manual of the interface, described in the expert report
- Compliance with workplace safety, health and hygiene parametersCE declaration of conformity and acceptance-test report
- Remote maintenance, diagnostics or controlLogs of remote support sessions, tickets, alarms read remotely
- Continuous monitoring of conditions and process parameters by sensors, adapting to driftTime series of process parameters and alarms, with the corrections applied
For Annex V intangible assets (software, platforms, AI solutions) the law requires interconnection; in practice two-way exchange with company systems is expected. This tool is a reminder: checking the requirements is the expert assessor's job.
The moment of interconnection
The benefit runs from the tax period in which the asset entered service and was interconnected; for hyper-depreciation the completion notice to the GSE can only be sent after interconnection.
The technical characteristics must already exist at first use. Interconnection can only come later to adapt the IT infrastructure, and until then the benefit does not start.
With objective data: the first recorded exchange between machine and management system, not a statement written afterwards.
The incentive doesn't end with the expert report.
For the whole benefit period the asset must stay with the company, in a production facility in Italy, with its 4.0 characteristics and interconnected, documented with adequate, systematic reporting.
The life of an investment with hyper-depreciation
Advance notice
To the GSE, with the investment details and the expected interconnection date.
A copy of the notice and the receipt, in the "Procedure" section of the file.
Continuity of the history: try it
In real life requirements are almost always lost for technical reasons, not by choice. Pick an event and see how the asset's history looks: a documented stoppage is normal, a gap of months with no explanation is a problem at inspection.
What happens if the asset leaves the perimeter
Sale for consideration
Remaining instalments are lost, unless replaced in the same tax period (para 432).
Sale for consideration
If it occurs by 31 December of the second year after interconnection, the credit is reduced and the part used must be repaid (para 1060 L. 178/2020).
With the 2026 hyper-depreciation, on early readings, a sale without replacement only loses future instalments and does not require repaying those already deducted (unlike the recapture of D.L. 87/2018). Readings are not unanimous, though: some sources hold that forfeiture also reaches the instalments already used. The Revenue Agency circular has not yet been issued: document every choice and talk to your adviser before selling an incentivised asset.
- Sale for consideration or transfer abroad of the asset during the benefit period, unless replaced.
- Missing eligibility requirements or irregular documentation due to the company and not curable.
- Failure to keep the documents proving the costs were incurred and correctly calculated.
- False statements in the procedure.
- Inspections made impossible for reasons attributable to the beneficiary.
- Other breaches making the benefit, even partly, not due.
Two of the six grounds concern record-keeping directly: a file that is incomplete or not accessible at inspection is, for the law, the same as a missing requirement.
How long must the archive be kept? It depends on when you deduct the last instalment.
The practical rule is to keep everything until five years after the tax return in which the last instalment is deducted, and in any case until any open inspection is settled. Try it with your investment.
Last instalment in tax period 2035 → return filed in 2036 → inspections possible until 31/12/2036+5 = 2041
Other periods run alongside: accounting records, invoices and correspondence for ten years from the last entry (art. 2220 Civil Code); for 4.0 and 5.0 credits deemed non-existent, recovery runs to 31 December of the eighth year after use (art. 27, para 16, D.L. 185/2008); with an open inspection retention continues until it closes. The benefit calculation is indicative, on equal instalments, and does not replace a tax adviser.
The investment file
One file per incentivised asset, updated every tax year. Tick the documents you already have in order for one of your assets.
Purchase0 / 4
Quote, order and order confirmation
Contract or lease
Invoices and delivery notes citing the incentive law
Payments and proof of the 20% down payment
Asset0 / 3
Data sheet and manual
CE declaration of conformity
Serial number
Installation0 / 3
Delivery and acceptance-test report
Date of entry into service
Location: site and department
Interconnection0 / 3
Network diagram and IP address
Description of flows with company systems
First recorded exchange and interconnection test
Certifications0 / 3
Sworn technical report
Auditor's accounting certification
For 5.0: ex-ante and ex-post energy certifications
Procedure0 / 2
GSE notices with receipts and outcomes
For 4.0: notice to MIMIT
Tax0 / 3
Depreciation plan
Schedule of instalments or credit tranches
Tax returns in which they are used
Asset life0 / 3
Technical event log
Periodic interconnection reports with certified date
Any sale and replacement asset with comparison report
File completeness
Still to complete: purchase, asset, installation, interconnection, certifications, procedure, tax, asset life. Some items (5.0, MIMIT) apply only to certain regimes.
GSE notices and mandatory documentation: the asset file.
Machine data to store
You don't need every signal every second: you need a continuous, dated, readable history covering every tax period.
- Data exchange logs: orders and recipes downloaded to the machine, production confirmations returned to the ERP, with date, time and machine ID.
- Operating indicators: working hours, pieces produced, states (running, stopped, alarm) aggregated at least daily.
- Alarms and process parameters: the time series proving continuous monitoring and adaptivity.
- Remote maintenance sessions: who connected, when, and why.
- Periodic reports: a monthly or quarterly extract stored in a non-modifiable way, summarising the asset's interconnection status.
- Change log: network, firmware, PLC and supervisory software changes, with date and check that the connection was restored.
How to keep it
Today's software may not exist in ten years: the data must outlive it.
A format readable over time
Non-modifiability
Independence from suppliers
Controlled migrations
An index per investment
Under 5.0 the benefit is due only if the saving is real, and measured.
On top of interconnection data you need consumption before and after the investment. Without measurements stored before the investment, the baseline is a fragile estimate.
Ex-ante certification
- Who
- An independent assessor.
- What
- Estimates the reduction in consumption against a starting point: usually the previous year's consumption, or a counterfactual scenario for new facilities or processes.
- Minimum thresholds
- At least 3% on the production facility's consumption or 5% on the consumption of the process concerned.
Ex-post certification
- Who
- The assessor, once the investment is complete.
- What
- Attests that the investments were made as set out in the ex-ante certification.
- If it doesn't confirm
- The credit is revoked.
Why consumption must be compared per unit of product
The saving is proven by comparing like with like: same perimeter, same unit of product, adjusted for volumes. The example is a compressor room replaced with inverter machines; change the numbers to yours.
0.405 kWh/pc before → 0.311 kWh/pc after
Illustrative example. The normalisation method and perimeter are set by the assessor in the ex-ante certification; the threshold applies to the consumption of the facility or the process concerned.
Data to keep for 5.0
- Bills and main meter readings
- Consumption of the production facility before and after
- Line or machine sub-meters
- Consumption of the process concerned
- Production data (pieces, hours, tonnes)
- Normalising consumption per unit of product
- Data sheets of the old and new assets
- Comparison of energy performance
- Ex-ante and ex-post certifications with the spreadsheets
- Proof of the saving and of the method
- Renewable plant data (generation, self-consumption, storage)
- Proof of sizing and self-consumption
Ex-ante and ex-post energy monitoring data: every load metered, every reading stored.
What gets asked for, and the mistakes that cost the benefit.
Inspections can come from the GSE, with document and on-site checks on the procedure, and from the Revenue Agency, also with the Guardia di Finanza, on entitlement to the deduction or credit. Notices to the GSE are sworn statements (D.P.R. 445/2000): a false statement means forfeiture and may be a criminal matter.
What is usually asked for
- The complete file, with invoices and delivery notes citing the legal reference.
- The expert report and accounting certification, and consistent dates: delivery, testing, interconnection, completion notice.
- Proof that the asset is still interconnected: often live, with an order sent from the ERP to the machine and the data coming back, plus the history of previous periods.
- Location and serial number of the asset, checked against the documents.
- For 5.0, the consumption data and the saving calculation.
Common mistakes
Interconnection proven only by the expert report
Interconnection date declared but not documented
History lost when changing MES or ERP
Long stoppages or moves not recorded
Invoices or delivery notes without the legal reference
Data held by the manufacturer or cloud provider
Periodic GSE notices forgotten
Asset sold without assessing the effects
A four-layer architecture. Proof for the incentive becomes a by-product.
The data serves production first: efficiency, maintenance, quality, energy. Proof for the incentive is generated with no extra work. Select a layer.
Collection at the machine
The PLC or CNC exposes data over a standard protocol (OPC-UA, MQTT). A gateway or shop-floor edge device reads it and keeps a local copy in case the network goes down.
Network identification, data received from the machine
SMEs and large companies
Same obligations, different scale
- Incentivised assets
- A few, often one or two a year
- Minimum tool
- A gateway with history and a monthly PDF report per machine, a digital file per investment
- Who handles it
- The owner or administration, with the tax adviser and the machine supplier
- Typical risk
- Data left with the manufacturer, no reports after the expert report
Operational checklist
Tick what you have already done: your choices stay saved on this device.
Check the asset falls under Annex IV or V and meets the territoriality requirements
Put data ownership, exportability and interconnection support in the contract
For 5.0 or renewables: measure and store baseline consumption
Send the advance notice to the GSE
Three tools to keep the proof alive, year after year.
Three different pieces of software, each for one part of the problem: the register of incentivised assets, a machine's interconnection history, energy monitoring for 5.0. Pick an example and scroll through its three screens; click them to see them full screen.
under three regimes: 2026 hyper-depreciation, 2024 4.0 credit, 2025 5.0 credit.
the CL-07 machining centre's file is kept until 31 December, depreciated over ten tax years.
of deductible increase for CL-07: 180% of a €420,000 cost.
Demonstration interfaces with sample data: software, companies, assets, people and values are made up.
You get the incentive with the right papers. You keep it with the right data.
Nexus handles the technical side that makes interconnection real, provable and preserved over time, working with the company's tax adviser and expert assessor.
We coordinate production, IT, administration, the tax adviser and the expert assessor, so that each has the information they need at the right time.
We connect machines to the ERP and MES, build the data history and the periodic reports for each incentivised asset.
The same data flow that serves the incentive becomes a production tool: progress, stoppages, efficiency, energy.
- Analysis before purchaseWe check with the machine supplier how it will expose data, which protocols it uses and how it will connect to company systems.
- InterconnectionWe build two-way exchange between machine and ERP or MES and document the first exchange.
- Software development and integrationConnectors, historian, periodic reports per incentivised asset, technical event log.
- Support with technical documentation for the assessorNetwork diagram, flows, interconnection evidence.
- Continuity over the yearsMigration plans when the PLC, MES or ERP changes, periodic checks that the history is complete and readable.
- Energy monitoringFor projects with energy-saving requirements or goals.
We don't issue sworn technical reports, accounting certifications or tax opinions: those are for the expert assessor, the auditor and the tax adviser. We work alongside them so they find complete, orderly and consistent technical data.
- Data owned by the company, in open formats independent of the machine supplier.
- Traceability: every technical change on incentivised assets is documented.
- Clarity on limits: we say straight away if an asset, as it is, cannot be interconnected in a provable way.
- Proportionate solutions: for SMEs a gateway, history and essential reports; for groups a central register of incentivised assets.
Census
Of assets incentivised or to be incentivised, existing systems and GSE deadlines.
Data flow design
For each asset, shared with the assessor before installation.
Connection and testing
Of the interconnection, with dated evidence.
History and reports
Active from the first day of operation.
Ongoing oversight
Periodic checks and support with every technical change.
Many of the assets that hyper-depreciation supports are built, and installed, right here.
Machinery and equipment are Emilia-Romagna's top export, and the provinces of Modena, Reggio Emilia, Parma and Bologna host districts of machine builders. For a company buying an eligible asset the builder is often a few kilometres away: agree with them, from the order, which data the machine must record and keep.
share of machinery and equipment in Emilia-Romagna exports in 2024, about €22.4bn 1
regional exports in 2025, +1.3% on 2024 2
for the Chambers of Commerce 2026-2029 twin transition vouchers, including IoT, sensors and management software 3
Modena
Reggio Emilia
Parma
Where we work. We are based in Modena and work on site with companies in the provinces of Modena, Reggio Emilia, Parma and Bologna. We also work with companies in other provinces and regions, remotely or with agreed visits: write to us from anywhere in Italy.
- Unioncamere Emilia-Romagna, Emilia-Romagna exports in 2024 (18 March 2025)
- Istat, Export of Italian regions, Q4 2025 (March 2026)
- Agenda Digitale, 2026 twin transition vouchers: a guide for SMEs
- Modena Chamber of Commerce, Modena exports slightly up in 2025 (provisional data)
- Intesa Sanpaolo, Exports and strategies of Emilia-Romagna's industrial districts (29 May 2025)
- Emilia Chamber of Commerce, Hands-on generative AI workshops, second edition (circular)
- BI-REX, course on predictive maintenance of machines and plants (brochure)
The words of incentives, explained in one line.
- Hyper-depreciation
- An increase in the acquisition cost of 4.0 assets for income tax, deducted in instalments with depreciation
- Benefit period
- The tax years in which the increase is deducted or the credit used
- Interconnection
- Two-way data exchange between the asset and production management systems or the supply network, with unique network identification
- "5+2" rule
- Five mandatory characteristics and at least two of three further ones for Annex IV machinery
- Sworn technical report
- A document by a registered engineer or industrial expert, or an accredited body, attesting characteristics and interconnection
- Accounting certification
- The statutory auditor's attestation that the incentivised costs were actually incurred
- Completion notice
- The notice to the GSE that closes the investment and starts the increase
- Recapture
- Recovery of a benefit already used if the asset is sold or moved abroad
- Replacement investment
- A new asset with similar or better characteristics that lets the benefit continue after a sale
- Ex-ante / ex-post certification (5.0)
- Estimate and verification of the energy reduction linked to the investment
- Energy baseline
- The starting consumption against which the saving is measured
- Certified date
- Proof of when a document existed, for example a timestamp or compliant digital preservation
The questions we're asked most often.
17 questions
How long must an incentivised machine stay interconnected?
For the whole benefit period, that is, as long as you deduct increase instalments or use credit tranches. The 4.0 characteristics must exist from first use and remain for all the following years.
Isn't the expert report enough to prove interconnection?
The report attests the situation at the time of the inspection. For the following years the burden of proof is on the company, with systematic data and reports showing continuous exchange between the machine and company systems.
How long must hyper-depreciation documents be kept?
Until five years after the return in which you deduct the last instalment, and in any case until any inspection is closed. For an asset depreciated over ten years, that means about fifteen years from purchase.
What happens if I lose the documents?
The hyper-depreciation implementing decree lists failure to keep the documentation among the grounds for forfeiting the benefit.
Which machine data do I need to keep?
Exchange logs with the ERP or MES (orders and recipes sent, progress received), aggregated operating indicators, alarms and process parameters, remote maintenance sessions and a log of technical changes. What matters is continuity and dates, not every signal every second.
If the machine stands idle for months, do I lose the incentive?
A stoppage does not remove the asset's characteristics, but it must be documented with cause, duration and restoration. An unexplained gap in the data makes it hard to show the requirement was maintained.
Can I change MES or ERP during the benefit period?
Yes, but the migration must carry the data history with it, and the connection to the machine must be restored and documented straight away.
What happens if I sell the machine before depreciation ends?
With the 2026 hyper-depreciation the remaining instalments are lost, unless replaced in the same tax period with a similar or better new asset. For the 4.0 and 5.0 credits, a sale by 31 December of the second year after interconnection reduces the credit and the part already used must be repaid.
Can I move the machine to a plant abroad?
Moving it to production facilities abroad is treated like a sale: without a replacement investment, the remaining benefit is lost (hyper-depreciation) or the credit repaid (4.0 and 5.0, within the monitoring period).
Must the replacement asset be interconnected?
Yes: the replacement investment, its technological characteristics and its interconnection must all be attested.
Below €300,000, is self-certification enough?
For the old 4.0 credit, yes. For the 2026 hyper-depreciation, no: a sworn technical report is always required.
Which periodic notices go to the GSE?
By 20 January each year, a notice on investments and expected use; by 30 June, one with the depreciation plan and the instalment per tax period, until the benefit ends.
Which energy data does 5.0 need?
Baseline consumption (bills, meters, sub-meters), consumption after the investment, production data for normalisation, and the ex-ante and ex-post certifications with the calculations. Without stored measurements, the baseline is an estimate that is hard to defend.
Can the data stay on the machine manufacturer's cloud?
It can, but the contract must guarantee it remains the company's and can be exported for the whole retention period. It is still worth keeping a copy in an independent company archive.
Who carries out inspections?
The GSE for the procedure and notices, the Revenue Agency (also with the Guardia di Finanza) for entitlement to the deduction or credit. An inspection may include a live test of the interconnection.
Why choose Nexus for interconnection and data?
Because we combine machine and software integration, historian development and knowledge of the 4.0 requirements: we build the interconnection, document its start and keep it provable over the years, working with the company's expert assessor and tax adviser.
Does hyper-depreciation change if the company is in Emilia-Romagna?
No: it is a national measure with the same rules across Italy (Law 199/2025 and the implementing decree of 7 May 2026). Local tools can sit alongside it, such as the twin transition vouchers of the Modena, Emilia (Parma, Piacenza and Reggio Emilia) and Bologna Chambers of Commerce: whether they can be combined must be checked call by call with the tax adviser.
The laws cited in this guide.
- Law 199 of 30 December 2025 (2026 Budget Law), art. 1, paras 427-436: 2026-2028 hyper-depreciation; para 432 on sale and relocation.
- MIMIT-MEF interministerial decree of 7 May 2026, implementing the hyper-depreciation: GSE procedure, documentation (art. 7), forfeiture (art. 10).
- Decree-Law 38 of 27 March 2026, art. 7, converted by Law 88/2026: removal of the EU/EEA production requirement for hyper-depreciation.
- Law 178 of 30 December 2020, art. 1, paras 1051-1063: tax credit for 4.0 capital goods; para 1060 on sale and replacement investment.
- Law 232 of 11 December 2016, Annexes A and B: characteristics of 4.0 assets.
- D.L. 19 of 2 March 2024, art. 38, and D.M. 23 July 2024: Transizione 5.0.
- D.L. 87 of 12 July 2018, art. 7: recapture of the previous hyper-depreciation.
- D.P.R. 600 of 29 September 1973, arts 22 and 43: keeping records and assessment deadlines.
- D.L. 185 of 29 November 2008, art. 27, para 16: deadlines for recovering non-existent credits.
- Civil Code, art. 2220: keeping accounting records.
- Revenue Agency Circular 9/E/2021: clarifications on the 4.0 credit.
Note. Information updated 16 November 2026. The Revenue Agency circular on the 2026 hyper-depreciation does not yet appear to have been published: some readings (sale without recapture, calculating remaining instalments) are interpretations by commentators. Always check with your tax adviser.
Have incentivised assets to look after, or an investment on the way?
We start from the list of machines and the systems you use today: we'll tell you how to make them interconnected in a provable way and how to keep the data for the whole life of the benefit. We reply in person, usually within one working day.
